Skip to content
Services / New Construction / Remodels / New Construction Plumbing Top-Out in Fort Worth, TX
New Construction / Remodels · New Construction Plumbing Top-Out in Fort Worth, TX

New Construction Plumbing Top-Out in Fort Worth, TX.

Phase 2 of new home plumbing — vertical risers, tub and shower valves, washing machine boxes, and in-wall infrastructure installed before drywall. Inspected and documented at each stage.

  • Texas Responsible Master Plumber License #M45785
At a glance
Warranty
2 years parts, 1 year labor
Financing
Available
What we do

What we do, plainly.

Plumber on a ladder running top-out plumbing in a framed new home

Circle T Plumbing provides new construction top-out plumbing for custom home builds and small residential construction projects across Fort Worth and North Texas. Top-out is Phase 2 of the three-phase new construction plumbing sequence — completed after rough-in is inspected and framing is advanced, before insulation and drywall close the walls for good.

This is the last window to access in-wall plumbing infrastructure. Top-out work done right means every fixture connection, valve rough, and in-wall stub is in the correct position before the drywall crew arrives. Work done wrong at this stage means cutting open finished walls later.

Texas state law requires new construction plumbing to be performed under a licensed master plumber. Patrick McKinnis holds Texas Responsible Master Plumber License #M45785 — the highest credential issued by the Texas State Board of Plumbing Examiners.

What Happens During Top-Out

Top-out is performed after the roof is on, framing is complete, and rough-in has passed inspection. During this phase, Circle T Plumbing installs:

  • Vertical supply risers — hot and cold supply lines extended from rough-in stub-outs to each fixture location
  • Tub and shower valve rough assemblies — pressure-balanced or thermostatic valve bodies set in-wall at correct depth for finish tile thickness
  • Washing machine box — recessed box with hot, cold, and drain connections set flush to finished wall
  • Water heater rough connections — supply, discharge, and gas (or electrical) rough connections positioned before the mechanical room is closed
  • Remaining vent stack penetrations — any vent runs that were not part of the rough-in phase

Where required, Circle T conducts a pressure test at top-out stage and coordinates inspection sign-off before drywall installation.

Pre-Drywall Is the Last Chance

Every in-wall connection at top-out stage needs to be confirmed for position, depth, and alignment before drywall. Tub and shower valve bodies in particular are depth-sensitive — the valve trim must sit flush with finished tile, which means rough depth depends on tile thickness. Circle T communicates valve depth requirements to the tile contractor to prevent fit problems at trim-out.

This kind of trade coordination is where a hands-on master plumber earns their place on a custom home project. Patrick McKinnis handles this directly.

Inspection and Documentation

Top-out inspection requirements vary by city and project type. Circle T manages permit documentation, schedules required inspections, and provides sign-off records so your general contractor has a clean paper trail at each phase.

How Top-Out Connects to the Other Phases

Top-out does not stand alone. It follows Rough-In (Phase 1) and sets up Trim-Out (Phase 3) — the final phase where fixtures, faucets, and toilets are installed and the plumbing system is commissioned.

Circle T handles all three phases, which means the plumber setting valves at top-out is the same one who confirmed fixture locations at rough-in and will be setting fixtures at trim-out. No handoff gaps. No “the last plumber did it that way” conversations.

Pricing and Scheduling

You approve the price before work begins — that’s the Circle T Trust Guarantee, and it applies to new construction the same as any other service. Top-out pricing is project-specific based on fixture count and scope. For scheduling purposes, top-out typically follows rough-in inspection by a few weeks once framing advances.

Contact Circle T Plumbing to discuss your new construction project scope and build timeline.

Call (682) 916-7396

Available in: Fort Worth area | Cleburne area

How it goes

Step by step.

  1. 1

    Vertical supply risers

    Hot and cold supply lines extended from rough-in stub-outs to each fixture location.

  2. 2

    Tub and shower valve rough assemblies

    Pressure-balanced or thermostatic valve bodies set in-wall at correct depth for finish tile thickness.

  3. 3

    Washing machine box

    Recessed box with hot, cold, and drain connections set flush to finished wall.

  4. 4

    Water heater rough connections

    Supply, discharge, and gas (or electrical) rough connections positioned before the mechanical room is closed.

  5. 5

    Remaining vent stack penetrations

    Any vent runs that were not part of the rough-in phase.

  6. 6

    Pressure test and inspection

    Where required, Circle T conducts a pressure test at top-out stage and coordinates inspection sign-off before drywall installation.

Proof

What customers say.

  • Top notch plumbing company to work with!
    Jamie S.
    Cleburne · Water Filtration
  • They went out of their way to fix a problem that another company created.
    Jeremy S.
    Cleburne · Tankless Water Heater
  • Communication was excellent and all questions or concerns I had were answered by professionals.
    JP
    Cleburne · Drain Cleaning
Warranty
2 years parts, 1 year labor
Financing
Available
FAQ

Common questions.

Get your quote.

Tell us what's going on and we'll lay out your options plainly. You approve before we start.

Where we serve
Fort Worth

Also Benbrook, Burleson, Crowley, Mansfield, Arlington, and nearby.

Cleburne

Also Joshua, Keene, Alvarado, Godley, Grandview, and nearby.

View all service areas

Related services

Get your free estimate

Tell us what's going on — we'll call you right back.

What do you need?

We'll never share your information.